The progress for today:
Another bedroom on the second floor was framed (the one above the garages.
They removed one of the front pillars - we don't know why and we have to ask our field manager to know more about their reason behind this sabotage.
The pillar was thrown into the pile of sand - now we are a bit concerned about the foundation on the front of the home.
Walls for the second level are done:
From different angles:
(2nd floor: left to right)
My library (loft), smaller size of room (we might use it as our study room) and our master bed-room
(1st floor: left to right)
Great room (our living room), dining room and kitchen (open floor plan)
(ground floor)
unfinished basement
The stairs to nowhere are now the stairs from the main floor to the second floor
Our kitchen has a roof now (not an official one)
First look at the second floor:
Another guest bedroom (above the garages):
The view from our loft to our master bedroom, through the walls (spooky being able to walk through walls, by the way)
Not bad -- they finished the framing of the whole second floor in only one workday, as well as the floor itself and walls.
Saturday, August 15, 2009
Home Construction (Day 16 - August 5)