Sunday, August 30, 2009

Home Construction (Day 24 - August 17)

Note: the usual photographer is back, so the picture quality gets better now. Thanks a lot, Russian, for filling in while I was gone!

They completed our roof finally, and carried away all the extra equipment lying around up there:


It looks pretty now - it has a hat to cover itself from the rain:


They also covered our side windows with the obnoxious blue paper. Oh well:


The look from the main door - our 2-level foyer and the stairs going up to the second floor:


There are no big changes in the basement today, other than the fact that it's more sunny than last time:

But they've started painting the locations of all the doors and sink fixtures, etc.:


See their drawings on our master bedroom floor:


We have a bunch of stuff again inside our garage (plumbing / electrical / HVAC* related)


We also discovered that we have windows now (we mean the supplies for the windows), which haven't been installed yet though:


We'll see what happens tomorrow...


*HVAC: Heating, Ventilation, and Air Conditioning. Yeah, we speak the construction lingo now**.


**No, no actually we don't... : (

0 comments: