Home Construction (Day 25 - August 18)

We stopped by at our normal time after work, and we actually ran into the people who installed our windows. We didn't want to interrupt them, since they were cleaning up & trying to go home as well, so we waited until they finished with their work (not that long, only 10 minutes) and then took our usual tour of the home:



It seems they've completed some of our back windows, but the basement door and window have not been installed yet:



It's so nice to have windows in the kitchen & dining rooms now:




But they are really careful, they moved both the new door and window inside the basement. They bought the water heater and water softener for our home. See the left corner (2 big boxes), not yet installed or unpacked:


There are some wires for heater (made from steel) to the basement room, seem to be made of thick copper:


More than half of the stuff that was piled up in the garage yesterday is now gone:



Turns out, the boxes were the bathroom supplies - as you can see we now have a master tub and second floor main tub:



Ok let's see it closer:


It already has a texture sort of like tile, but made of the same material as the tub itself.

They also drilled holes from the main floor to basement - I hope they will do something with these:



They added pipes for our laundry room:



All around, they did many things today - plumbing and windowing mainly.

Milestone#4 "Frame complete (frame, windows and roof) " COMPLETED!

High-five!!! Yeah! Awesome.